First layer of drywall mud or plaster
|
|
|
|
More drywall mud and plaster applied
|
|
|
|
Fast setting drywall plaster, makes it easy to the job in one day.
|
|
|
|
|
Another view of drywall plaster applied to water heater stand.
|
|
|
|
Getting closer to spraining texture
|
|
|
|
Starting to look good as drywall plaster dries quickly
|
|
|
|
|
Everything tarps, taped and spraying drywall texture
|
|
|
|
Another view of finished drywall texture
|
|
|
|
Putting things into perspective as drywall texture dries
|
|
|
|
|
Before cleaning water supply pipes for water heater
|
|
|
|
After cleaning with a wire brush
|
|
|
|
Water heater is installed and fully operational
|
|
|
|
|
Another view of finished water heater and drywall damage
|
|
|
|
Earthquake straps installed and ready for the big one.
|
|
|